SFDC - Time RecordingOnce an operation is ready to execute the operator can indicate to the system whether they’re “setting” or “running” thereby enabling times to be recorded for both – which can then be compared to the setting and run-time estimates. If the part is a regularly manufactured production part these actual times can be used to update the parts master template time estimates to better reflect reality.
Breaks/pauses can be recorded. If an operator is working multiple machines they can pause all of them by a single click and then restart them all via another single click. Estimated setting and run times can optionally be shown on the screen against each operation. Multiple operators can be logged onto a job/operation concurrently and all the times are recorded within the TRICORN:Production system. Job/Op duration can optionally be amended by operators on the shop floor (e.g. if they forgot to clock off a job) although this can be hidden so that any changes are effected by the production manager or admin staff. |
|